Sludge drying equipment is a green, energy-saving, environmental protection of large mechanical equipment. It can achieve the goal of sludge harmless, stabilization, reduction and resource treatment. The dried sludge not only reduces the odor, but also greatly facilitates its transportation, and improves the economy and use value of the sludge itself. Therefore, it is favored by many industrial enterprises. Most manufacturers provide installation services for the sludge drying equipment purchased by users. The equipment installation cannot be carried out directly, so it is necessary to make preparations before installation.

Before the main body of sludge drying equipment is installed, the foundation of equipment base needs to be constructed. Under the guidance of the manufacturer's technical personnel, the user needs to cast the equipment foundation in strict accordance with the manufacturer's standards, and then install the equipment on the stable foundation.

 

Jiaozuo ZJN Environmental Protection Equipment Technology Co., Ltd.

 

Precautions for installation of main body of sludge drying equipment:

1. Before installation, it is necessary to check whether each part of the equipment is defective and whether the main body of the equipment is defective. If the parts are missing or damaged, it is necessary to contact for re delivery in time.

2. Remove the protective coating applied in the packaging process and the dust, oil, rust, etc. on the equipment, and check the damage caused by maintenance during transportation, loading and unloading.

3. In the installation of the main equipment, it is necessary to strictly install the relevant design requirements for installation. After installation, it is necessary to tighten the anchor bolts to ensure the stability of the equipment.

4. For the installation of other auxiliary accessories, the correct installation should be carried out according to the instructions made by the manufacturer or the instructions of the manufacturer's technical personnel.

After the installation, it is also necessary to carefully check the whole equipment. After confirming that there is no error, add lubricating oil to the bearing and related parts of the equipment, and you can enter the equipment commissioning link. If the equipment commissioning link is to check the operation of the equipment, such as whether the drying efficiency, the quality of dried sludge products and other problems can meet the requirements of users, if not, it is necessary to check Continue debugging until the user's requirements are met. After debugging, it can enter the formal production.

 

Jiaozuo ZJN Environmental Protection Equipment Technology Co., Ltd.

 

During the operation and production of sludge drying equipment, some accidents may occur, such as abnormal noise, low drying efficiency, poor quality of dried sludge products, equipment shutdown and so on. Usually equipment failure occurs frequently, that is, equipment maintenance work is not done in place. Do a good job of equipment maintenance, can ensure the normal operation of the equipment production, extend the service life of the equipment.