Three way pulp sludge drying equipment can quickly and efficiently treat pulp sludge, and the dried sludge is dry and wet evenly, which is loved by the majority of users. To ensure the good working performance and long-term durability of the drying equipment, the correct installation of the equipment is the key premise. Below, to three return pulp sludge drying equipment installation considerations, for you to introduce in detail.
1、 Before installing the three return drying equipment for pulp and sludge, it is necessary to understand the installation drawings, relevant technical documents, structural characteristics of drying equipment and some corresponding assembly technologies. Then, according to the actual situation, formulate the corresponding construction scheme, and confirm the correct installation sequence of the equipment and related auxiliary accessories.
2、 Before installing the equipment, it is also necessary to check whether the equipment and related parts are complete. If not, the manufacturer should be informed in time to replenish. Then clean the equipment and related parts, such as the rust removal of the equipment, and apply new lubricating oil to prevent the equipment parts from being polluted or rusted.
3、 First of all, according to the installation sequence of the equipment, the installation sequence of the equipment should be made before and after the installation of the equipment. In the process of re installation, attention should be paid to handle it with care to prevent equipment damage due to excessive force or improper operation.
4、 In the process of installation, the base plate is used to fix the equipment barrel, wheel belt and supporting wheel on the foundation base. At the same time, it is necessary to determine the reasonable layout of the base plate. The base plate should be kept as close to the anchor bolt as possible and arranged at the middle point of the load, so as to ensure the uniform stress of the equipment in the operation process.
5、 After the installation of the three return pulp sludge drying equipment, the whole equipment needs to be carefully inspected to check the connection status of each connecting part to ensure the tightness of its screws and bolts. After the inspection, it is necessary to test run the equipment. In the process of trial operation, it is necessary to check the working conditions of all parts of the equipment. If there is any abnormality, it is necessary to stop the machine for inspection and eliminate the fault. After the trial operation, the equipment can be put into formal use without other problems.
Copyright ©2022 by Jiaozuo ZJN Environmental Protection Equipment Technology Co., Ltd.